Knowledge Base

When can I expect an inspector to handle my complaint?

The Engineering Division strives to address all complaints in a timely manner. However, during construction season (April to November) it may take longer to completely evaluate “non-emergency” complaints. Most of the typical pavement, drainage, and sidewalk complaints are generally answered when construction season slows down.
Updated 4/4/2013 3:46 PM
Was this page helpful? Yes No
Thanks for your feedback!